![](https://static.wixstatic.com/media/0528ae_55ec64f478494996ad3486dc325b2dc6~mv2_d_3240_4320_s_4_2.jpg/v1/fill/w_216,h_288,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/0528ae_55ec64f478494996ad3486dc325b2dc6~mv2_d_3240_4320_s_4_2.jpg)
Port of Mobile, Ship-loader Erection
![1-truck-custom-transport.jpg](https://static.wixstatic.com/media/0528ae_fd59855752a74f5b8917b984069e3959~mv2.jpg/v1/fill/w_702,h_235,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/1-truck-custom-transport.jpg)
Truck & custom transport trailer using hydraulic dollies.
Assemble, Test and Commission one Stacker/Reclaimer
Location: Mobile, Alabama
Client: Port of Mobile
Project: Assemble, Test and Commission Stacker/Reclaimer
Global Rigging and Transport was contracted to assemble, test and commission one Stacker/Reclaimer for the Port of Mobile in Mobile, Alabama. As part of the assembly GRT offloaded and transported the sections of the Stacker/Reclaimer from the ship to the assembly site; nearly two miles. The larger pieces, up to 75 tons, were transported using GRT's two heavy duty rough terrain transport trucks with custom transport frames and hydraulic dollies. Global Rigging & Transport personnel successfully performed all tasks within their scope of supply and were also able to offer suggestions and assistance to other parties involved.
![](https://static.wixstatic.com/media/e25f79_ba869dcd549b497bab2aca035e9417a0~mv2.jpg/v1/fill/w_685,h_307,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/e25f79_ba869dcd549b497bab2aca035e9417a0~mv2.jpg)
Transporting bulky loader segment with transport truck and heavy duty drop deck trailer.
![3-main-shuttle-in-place-on-.jpg](https://static.wixstatic.com/media/0528ae_64815fec321f4c638ba766cbb7ff5fcf~mv2.jpg/v1/fill/w_88,h_66,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/3-main-shuttle-in-place-on-.jpg)
Main Shuttle in Place on Tracks
![4-ship-loader-assembly.jpg](https://static.wixstatic.com/media/0528ae_af5f1c6e8abe46a2bea6dfa87e8f4f06~mv2.jpg/v1/crop/x_0,y_0,w_343,h_263/fill/w_86,h_66,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/4-ship-loader-assembly.jpg)
Ship Loader Assembly
![5-reeving-operations.jpg](https://static.wixstatic.com/media/0528ae_3695b82b3cb946969fb51020d867f9c9~mv2.jpg/v1/fill/w_88,h_66,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/5-reeving-operations.jpg)
Reeving Operations
![](https://static.wixstatic.com/media/e25f79_fdf19062b43c4c4bb40f012435d20a59~mv2.jpg/v1/fill/w_86,h_64,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/e25f79_fdf19062b43c4c4bb40f012435d20a59~mv2.jpg)
Nearing Completion