Relocation Three (3) STS Container Cranes by Barge.

Relocation Three (3) STS Container Cranes by Barge.

canfor-1.jpg

View of pre-assembled boiler floor at GRT before moving into boiler house

canfor-3.jpg

Moving one of twelve 50ft wall platens into the boiler house - each weighed just over 20,000 lbs.

canfor-2.jpg

The two dollies shown in the configuration have a capacity of 40 tons each. However, the load shown here weighs in at 18 tons total. The dolly on the right has a power pack that supplies the power for driving, steering and jacking.

canfor-4.jpg

One of the twelve wall platens being lifted off the drive dolly and tailed up vertically using a standard steering dolly.


Note that the wall panel is in a position at the 90 degree corner and that all modules had to be negotiated around.

canfor-8.jpg

The access hole in the building - the overall max height was 8'.

canfor-13.jpg

Frame and floor assembly in final position ready for jacking operations after all the welding was completed.

canfor-9.jpg

Squeezing the first floor module through one of the two openings in the building that we needed to pass through on route to the boiler house.

canfor-14.jpg

Frame and floor assembly jacked into final position.

COMMITMENT     EXPERIENCE     INNOVATION

Global Rigging and Transport (GRT) specialize in heavy equipment moves, crane services; crane moving, crane modifications and repairs, crane assembly and dismantling, heavy lift and transport, emergency response, project cargo, load testing, salvage, barge cranes and custom engineering.
GRT's engineering department can design custom applications to fit your rigging needs anywhere in the world. We have offices in Virginia (US), British Columbia (Canada), San Antonio (Chile) and Panama City (Panama). Contact us today!

© 2025 GRT

bottom of page