Relocation Three (3) STS Container Cranes by Barge.
Relocation Three (3) STS Container Cranes by Barge.

View of pre-assembled boiler floor at GRT before moving into boiler house

Moving one of twelve 50ft wall platens into the boiler house - each weighed just over 20,000 lbs.

The two dollies shown in the configuration have a capacity of 40 tons each. However, the load shown here weighs in at 18 tons total. The dolly on the right has a power pack that supplies the power for driving, steering and jacking.

One of the twelve wall platens being lifted off the drive dolly and tailed up vertically using a standard steering dolly.
Note that the wall panel is in a position at the 90 degree corner and that all modules had to be negotiated around.

The access hole in the building - the overall max height was 8'.

Frame and floor assembly in final position ready for jacking operations after all the welding was completed.

Squeezing the first floor module through one of the two openings in the building that we needed to pass through on route to the boiler house.

Frame and floor assembly jacked into final position.