Crane dismantling
Campbell River Crane Demolition
Campbell River, British Columbia
Taking a retired ship-to-shore crane out of service
GRT and AMIX completed the controlled demolition of a retired ZPMC ship-to-shore crane in Campbell River, British Columbia, in March 2025.
- Crane height
- ~170 ft
- Crane weight
- ~1,200 tons
- Completed
- March 2025

From Vancouver to the demolition site
The 1996 ZPMC crane had spent nearly 30 years handling containers in Vancouver. It could lift 50 long tons under the spreader, but had reached the end of its service life. The team rolled it onto an AMIX barge at a Vancouver terminal and unloaded it at AMIX’s Campbell River yard for demolition and recycling.
Preparing for a controlled fall
GRT and AMIX planned the fall around a designated landing area at the inactive waterfront site. The crew removed oils, lubricants and hydraulic fluids before demolition and added temporary bracing to stabilize the structure during preparation.
Landing and recycling
The crane came down within inches of the planned footprint, according to the GRT project report. Once it was on the ground, AMIX took over site cleanup and scrap processing for recycling.