Crane relocation
PortMiami Crane 9 Relocation
Miami, Florida
From Wharf II to Wharf V
In September and October 2025, Crane 9, a ZPMC ship-to-shore gantry crane, was relocated by barge from Wharf II to Wharf V at PortMiami.
- Crane
- ZPMC ship-to-shore
- Wharf-to-wharf
- II to V
- Project dates
- Sep–Oct 2025

Transporting Crane 9 across PortMiami
Project photographs show GRT’s Containerized Transport Truss System (CTTS) beneath Crane 9 aboard the Charlotte Bridge barge. The port’s crane operator reports the move increased use of Crane 9 and improved the efficiency of Cranes 7 and 8.



